Layo
Try it free
How it works

Survey, layout, install, export

Four screens that follow the job in the order you do it.

01

Survey the room

Draw the room corner by corner and enter the measurements you took. Diagonals cross-check the shape, so a wall that is out by a few millimetres shows up here rather than halfway through the floor.

  • Laser, tape or estimated measurements
  • Diagonals confirm the shape to ±1 mm
  • Several rooms and doorways as one floor
Several rooms, one floor
02

Work out the layout

Pick the product and the pattern, then let the boards run toward the light or wherever the numbers work best. Layo lays every piece within the fitting instructions and shows packs, waste and cuts for each option.

  • Straight rows, herringbone, chevron or basket weave
  • Toward the light, or the direction with the least waste
  • Packs, rows and waste for every option
Patterns, worked out

On site and after

Then
01

Survey

Measure the room and check the numbers agree.

02

Layout

Compare layouts and choose on packs and waste.

03

Install

Work row by row, each piece numbered and sized.

04

Export

Cut sheet PDF, printable plan, project file.

One wasted pack costs more than Layo.